Decoration is a big project, the cost of manpower and material resources are indispensable, as the owner must hope that the process of decoration is smooth, but in the process of decoration, it is inevitable that you will not encounter a place to rework.

Rework not only increases the budget, but also extends the construction period, which is very unfriendly to the owner, if the rework is done once, it is good, the most afraid is that a place is reworked many times, which makes people inevitably irritated.

Below I will share with you 5 points to pay attention to, if you have time to decorate, try to stare at it yourself, so as to minimize the number of rework in your home.

Hydropower retrofit

Water and electricity are unreasonable, and life is not convenient

The circuit planning is unreasonable, resulting in the reserved socket is not enough, and some of the reserved positions are unreasonable, and the bright line is not covered, which makes it ugly, and affects the experience in the later stage, so it is necessary to rework.

The circuit construction was rough, the installation was perfunctory, and the line was completely fixed, resulting in the inability to replace the line in the later stage.

The pressure of the water pipe does not reach the standard, the connection is not firm, the pipe seal is not sealed, and the water pipe is easy to leak or crack.

(The pressure of the water pipe is in accordance with the standard, the pressure should be 01.0~0.0, and it should be static for one hour after the pressure, and the water pressure cannot be reduced by 0.0Mpa within one hour)

watertight

The waterproofing is not done well, and the leakage is certain

Obviously waterproof, why does there still leak? In order not to cause trouble to the neighbors, to ensure the harmony of the neighborhood, to the end.

This may be when installing tiles, accidentally destroying the more fragile waterproof layer and falling off.

All renovations should be tested twice, one after the waterproofing layer and the other after the bathroom construction is completely completed or the tiles are pasted.

Latex paint

The colors are not in tune, and the background wall becomes an abstract painting.

Personally, it is recommended that latex paint can be selected as a finished color or computer color matching, otherwise it is difficult to ensure the appearance of the wall.

Artificial color grading is full of uncertainty, it is difficult to ensure that the color is the same every time, and if the wall is damaged and needs to be repainted, it is also difficult to adjust the previous color.

tile

One of the projects with the highest chance of rework

When decorating, because there are many problems involved in tiles, if the color is wrong, the color difference is large, the flatness is not enough, and the cutting is not done well, etc., all need to be reinstalled.

Therefore, when installing tiles, we need to keep an eye on it, and it is best to see if the color is correct and whether the color difference is large after the tile arrives.

If you find any problems when laying tiles, you must ask questions in time, and don't be afraid of making mistakes and losing face.

Custom-made furniture

The size and color are not right, which means that it can't be installed and ugly.

The most important thing about custom furniture is its size, and a custom surveyor should come to your home to measure it at least three times to ensure accurate dimensions.

When measuring, it is best for us to follow it ourselves, avoid sloppiness of surveyors, and communicate clearly the size of the gap to be reserved.

When customizing furniture, it is best not to choose a color that is darker than the floor, and try to choose colors and patterns that match the whole, otherwise it will be ugly.